GUANXIANGNew Material Technology

Verification

Certifications and quality control

Certificates and statements

Documents available for review

Documentation on request

ISO 9001 quality management

Quality management system covering cellulose ether production and packing

Certificate number and validity dates are supplied with the document package.

Request document
Documentation on request

ISO 14001 environmental management

Environmental management system for the production site

Available to qualified buyers during supplier qualification.

Request document
Issued per shipment

REACH SVHC statement

Substance screening statement for products shipped to EU markets

Prepared against the current candidate list at the time of shipment.

Request document
Available now

Product TDS and SDS set

Technical and safety documentation for every product family

Request the current revision for the grade you are evaluating.

Request document

Laboratory

What each batch is tested for

Testing is carried out on the finished batch. Methods follow the technical data sheet for each product, so results can be compared with the specification you received.

TestMethodPurpose
Solution viscosityRotational viscometer, controlled temperatureConfirms grade consistency between batches
Moisture contentMoisture analyserControls storage stability and dosing accuracy
Ash contentMuffle furnaceIndicates inorganic residue level
pH valuepH meter on prepared solutionChecks compatibility with cement and gypsum systems
Gel temperatureControlled heating bathVerifies behaviour in warm-climate applications
Appearance and bulk densityVisual inspection and bulk density cupScreens packing and flow behaviour

Process

Quality steps between raw material and dispatch

  1. 01

    Incoming raw material check

    Each incoming lot is checked against the agreed specification before it enters production.

  2. 02

    In-process sampling

    Samples are taken during reaction and drying, with adjustments made before the batch is released.

  3. 03

    Final batch testing

    Viscosity, moisture, ash, pH and appearance are tested on the finished batch, not on a composite sample.

  4. 04

    Batch record and dispatch

    A batch record is retained, and the batch number is printed on the packaging for traceability.

Next step

Build the qualification file

Request the certificate package, current TDS revisions and batch test format for the grades you are evaluating.